DIYPicks

Henry 555 LevelPro 40 lb Review (2026)

By Nate Sawyer, Editor ยท Updated July 2026

DIYPicks is reader-supported. As an Amazon Associate and affiliate of home-improvement retailers, we may earn a commission when you buy through links on our site โ€” at no extra cost to you. This never affects our recommendations.

4.4$40per 40 lb bagCheck Price on Amazon โ†’

A strong alternative to LevelQuik when you need to fill deeper low spots, thanks to its 1.5 in single-pour depth. Slightly more forgiving flow, but like all self-levelers it lives or dies by proper priming.

Pros

  • Pours up to 1.5 in thick in a single lift, so it fixes deeper dips that a 1 in-max leveler can't in one pass
  • Extended flow keeps it self-leveling a bit longer than the fastest rapid-set products, easier for beginners
  • Tile-ready in about 6 hours and walkable in 2, keeping a weekend bathroom project on schedule

Cons

  • Still needs the matching Henry primer on porous and non-porous substrates, skipping it invites debonding
  • Deep 1.5 in pours consume bags fast, cost climbs quickly on a badly sloped floor
  • Not a wear surface, it must be covered by tile or flooring and can't be left exposed

Specifications

TypePortland cement self-leveler
BaseConcrete / wood (primed)
Coverage~43 sq ft at 1/8 in
Thickness1/8 in to 1.5 in single pour
CureWalk in 2 hr, tile in 6 hr

Frequently Asked Questions

How thick can Henry 555 LevelPro be poured in one pass?
From 1/8 inch up to 1.5 inches in a single lift. That depth is its main advantage over levellers capped around 1 inch, because deeper dips get corrected in one pour instead of two.
How much floor does a 40 lb bag cover?
About 43 sq ft at 1/8 inch. Coverage falls quickly as depth increases, so a badly sloped floor consumes bags and budget much faster than the bag count alone suggests.
Do I really need the primer?
Yes. It requires the matching Henry primer on both porous and non-porous substrates. Skipping primer is the most common cause of debonding, where the leveller cures into a slab that is not actually bonded to the floor beneath it.
How soon can I tile over it?
Walkable in about 2 hours and tile-ready in about 6, which is what keeps a weekend bathroom project on schedule.
Can it be left as the finished floor?
No. It is not a wear surface and must be covered with tile or flooring.

Featured in these guides